IEC 61784-5-19:2024 ED2

Industrial networks - Profiles - Part 5-19: Installation of fieldbuses - Installation profiles for CPF 19 IEC 61784-5-19:2024 ED2

Publication date:   Apr 3, 2024

General information

60.60 Standard published   Apr 3, 2024

IEC

TC 65/SC 65C

International Standard

25.040.40   Industrial process measurement and control | 35.100.40   Transport layer

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61784-5-19:2024 is available as IEC 61784-5-19:2024 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 61784-5-19:2024 specifies the installation profile for CPF 19 (MECHATROLINKTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024.

[1] MECHATROLINKTM and Σ-LINKTM II are trade names of YASKAWA ELECTRIC CORPORATION. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trade names holder or any of its products. Compliance to this profile does not require use of the trade names. Use of the trade name requires permission of the trade name holder.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61784-5-19:2013 ED1

NOW

PUBLISHED
IEC 61784-5-19:2024 ED2
60.60 Standard published
Apr 3, 2024