IEC 61784-5-12:2018 ED2

Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses - Installation profiles for CPF 12

Publication date:   Aug 30, 2018

General information

99.60 Withdrawal effective   Mar 21, 2024

IEC

TC 65/SC 65C

International Standard

25.040.40   Industrial process measurement and control | 35.100.40   Transport layer

Buying

  Revised

PDF - €181.50

  English   French  



Buy

Scope

IEC 61784-5-12:2018 specifies the installation profiles for CPF 12 (EtherCAT™) .
This deliverable contains a number of related files covering the communication profiles to be used in conjunction with IEC 61918.
This installation profile documents contained herewith provide the installation profiles of the communication profiles (CP) of a specific communication profile family (CPF) by stating which requirements of IEC 61918 fully apply and, where necessary, by supplementing, modifying, or replacing the other requirements. The installation profiles are specified in the annex. This annex is read in conjunction with IEC 61918. This edition includes the following significant technical changes with respect to the previous edition:
a) addition of connectors (see A.4.4.2.2);
b) alignment with IEC 61918.

Life cycle

NOW

WITHDRAWN
IEC 61784-5-12:2018 ED2
99.60 Withdrawal effective
Mar 21, 2024

REVISED BY

PUBLISHED
IEC 61784-5-12:2024 ED3