IEC 61326-2-2:2005 ED1

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable test, measuring and monitoring equipment used in low-voltage distribution systems

Publication date:   Dec 15, 2005

General information

99.60 Withdrawal effective   Oct 2, 2012

IEC

TC 65/SC 65A

International Standard

17.220.20   Measurement of electrical and magnetic quantities | 25.040.40   Industrial process measurement and control | 33.100.20   Immunity

Buying

  Revised

PDF - €48.40

  English   French   Spanish  



Buy

Scope

this part of IEC 61326 specifies more detailed test configurations, operational conditions and performance criteria for equipment which is used for testing, measuring or monitoring of protective measures in low-voltage distribution systems, and powered by battery and/or from the circuit measured, and portable

The contents of the corrigendum of November 2007 have been included in this copy.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61326:2002 ED1

WITHDRAWN
IEC 61326:2002/COR1:2002 ED1

NOW

WITHDRAWN
IEC 61326-2-2:2005 ED1
99.60 Withdrawal effective
Oct 2, 2012

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC 61326-2-2:2005/COR1:2007 ED1

REVISED BY

WITHDRAWN
IEC 61326-2-2:2012 ED2