IEC 61158-4-14:2010 ED2

Industrial communication networks - Fieldbus specifications - Part 4-14: Data-link layer protocol specification - Type 14 elements

Publication date:   Aug 5, 2010

General information

99.60 Withdrawal effective   Aug 14, 2014

IEC

TC 65/SC 65C

International Standard

25.040.40   Industrial process measurement and control | 35.100.20   Data link layer | 35.110   Networking

Buying

  Revised

PDF - €284.35

  English   French  



Buy

Scope

IEC 61158-4-14:2010 specifies procedures for the timely transfer of data and control information from one data-link user entity to a peer user entity, and among the data-link entities forming the distributed data-link service provider; procedures for giving communications opportunities to all participating DL entities, sequentially and in a cyclic manner for deterministic and synchronized transfer at cyclic intervals; procedures for giving communication opportunities available for time-critical data transmission together with non-time-critical data transmission without prejudice to the time-critical data transmission; procedures for giving cyclic and acyclic communication opportunities for time-critical data transmission with prioritized access; procedures for giving communication opportunities based on standard ISO/IEC 8802-3 medium access control, with provisions for nodes to be added or removed during normal operation; the structure of the fieldbus DLPDUs used for the transfer of data and control information by the protocol of this standard, and their representation as physical interface data units. This second edition cancels and replaces the first edition published in 2007 and constitutes a technical revision. The main changes with respect to the previous edition are:
- Provide stability date for the publication;
- Update the Normative references and Bibliography;
- Corrections the edit error;
- Specification changes for CPF3;
- Update of the requirements for all conformance classes;
- Update of the requirements for all conformance services. This bilingual version published in 2012-01 corresponds to the English version published in 2010-08.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61158-4-14:2007 ED1

NOW

WITHDRAWN
IEC 61158-4-14:2010 ED2
99.60 Withdrawal effective
Aug 14, 2014

REVISED BY

PUBLISHED
IEC 61158-4-14:2014 ED3