Gives guidance and explanatory comments on the existing procedures for lightning and switching impulse testing of power transformers to supplement the requirements of IEC 60076-3. Also generally applicable to the testing of reactors, see IEC 60289, modification to power transformer procedures being indicated where required. Information is given on wave shapes, test circuits including test connections, earthing practices, failure detection methods, test procedures, measuring techniques and interpretation of results.
WITHDRAWN
IEC 60722:1982 ED1
99.60
Withdrawal effective
Jun 6, 2002
PUBLISHED
IEC 60076-4:2002 ED1