IEC 60364-7-704/FRAGF ED3

Low-voltage electrical installations - Part 7-704: Requirements for special installations or locations - Construction and demolition site installations IEC 60364-7-704/FRAGF ED3

General information

30.97   End of interruption of work - split/merged   Oct 10, 2018

IEC

TC 64

International Standard

91.140.50   Electricity supply systems | 29.020   Electrical engineering in general

Scope

IEC 60364-7-7-704:2017 lays down requirements which apply to installations for construction and demolition sites for use during the period of the construction or demolition work which are intended to be taken out of service upon completion of the works. Examples include the following:
- construction work of new buildings;
- repair, alteration, extension or demolition of existing buildings or parts of existing buildings;
- engineering works;
- earthworks;
- work of similar nature.
The requirements apply to fixed or moveable installations.
The requirements do not apply to installations in administrative locations of construction sites (e.g. offices, cloakrooms, meeting rooms, canteens, restaurants, dormitories, toilets).

This new edition includes the following significant technical changes with respect to the previous edition:
- clarification of the scope;
- clarification of compliance with standards;
- clarification of devices for isolation.

Life cycle

NOW

ABANDON
IEC 60364-7-704/FRAGF ED3
30.97 End of interruption of work - split/merged
Oct 10, 2018




Access Genorma App Everywhere

Get fast and easy access to top European and International standards (EN, ISO, IEC) via your mobile phone, tablet or the web.