FprHD 60364-7-712:2025

Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Solar photovoltaic (PV) power supply installations

Publication date:   Jul 4, 2025

General information

50.60   Close of voting. Proof returned by secretariat   Aug 15, 2025

CENELEC

CLC/TC 64 Electrical installations and protection against electric shock

Harmonization Document

27.160   Solar energy engineering | 29.020   Electrical engineering in general | 91.140.50   Electricity supply systems

Buying

  Draft

PDF - €105.02

  English  



Buy

Scope

IEC 60364-7-712:2025 applies to electrical installations of PV systems. The equipment of a PV system, like any other item of equipment, is dealt with only so far as its selection and application in the installation is concerned. A PV installation comprises all equipment from PV modules(s) up to the connection point to other parts of the installation, for example a distribution board or the utility supply point (point of connection).

This part of IEC 60364 includes requirements on electrical installation resulting from the installation of PV power supply installations.

Requirements relating to the possible installation of energy storage systems (e.g. batteries) are included.

Requirements are also included for PV installations for island mode operation described in IEC 60364-8-82.

This third edition cancels and replaces the second edition published in 2017. This edition constitutes a technical revision.

This edition includes the following significant technical changes with respect to the previous edition:

a) The technical content has been extensively revised and expanded, taking into account experience gained in the construction and operation of PV installations, and developments made in technology, since the second edition was published.

b) Key changes include requirements for PV power generation plants, direct connection to battery circuits, introduction of DC bus circuit and DCUs.

Life cycle

NOW

IN_DEVELOPMENT
FprHD 60364-7-712:2025
50.60 Close of voting. Proof returned by secretariat
Aug 15, 2025

CORRIGENDA / AMENDMENTS

IN_DEVELOPMENT
prHD 60364-7-712:2025/prAA