EN 62381:2012

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)

Publication date:   May 17, 2012

General information

60.60 Standard published   Apr 13, 2012

CENELEC

CLC/TC 65X Industrial-process measurement, control and automation

European Norm

25.040   Industrial automation systems

Buying

  Published

PDF - €55.53

  English  



Buy

Scope

IEC 62381:2012 defines the procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. The description of activities given in this standard can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in this standard is in accordance with future IEC 62708.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 62381:2007

NOW

PUBLISHED
EN 62381:2012
60.60 Standard published
Apr 13, 2012

REVISED BY

PUBLISHED
EN IEC 62381:2024