EN 61850-7-1:2011

Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models

Publication date:   Nov 17, 2011

General information

90.93   Standard confirmed   Jan 5, 2026

CENELEC

CLC/TC 57 Power systems management and associated information exchange

European Norm

33.200   Telecontrol. Telemetering

Buying

  Published

PDF - €145.85

  English  



Buy

Scope

IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for: - substation-specific information models for power utility automation systems, - device functions used for power utility automation purposes, and - communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces: - the model for statistical and historical statistical data, - the concepts of proxies, gateways, LD hierarchy and LN inputs, - the model for time synchronisation, - the concepts behind different testing facilities, - the extended logging function. It also clarifies certain items.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 61850-7-1:2003

NOW

PUBLISHED
EN 61850-7-1:2011
90.93 Standard confirmed
Jan 5, 2026

CORRIGENDA / AMENDMENTS

PUBLISHED
EN 61850-7-1:2011/A1:2020