EN 61850-4:2011

Communication networks and systems for power utility automation - Part 4: System and project management EN 61850-4:2011

Publication date:   Jul 19, 2011

General information

60.60 Standard published   Jun 10, 2011

CENELEC

CLC/TC 57 Power systems management and associated information exchange

European Norm

33.200   Telecontrol. Telemetering

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid</a>.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 61850-4:2002

NOW

PUBLISHED
EN 61850-4:2011
60.60 Standard published
Jun 10, 2011

CORRIGENDA / AMENDMENTS

PUBLISHED
EN 61850-4:2011/A1:2020