99.60 Withdrawal effective Nov 10, 2020
CENELEC
CLC/TC 65X Industrial-process measurement, control and automation
European Norm
25.040.40 Industrial process measurement and control | 35.100.05 Multilayer applications
IEC 61784-3-3:2010(E) specifies a safety communication layer (services and protocol) based on CPF 3 of IEC 61784-1, IEC 61784-2 (CP 3/1, CP 3/2, CP 3/4, CP 3/5 and CP 3/6) and IEC 61158 Types 3 and 10. It identifies the principles for functional safety communications defined in IEC 61784-3 that are relevant for this safety communication layer. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. The main changes with respect to the previous edition are: - updates in relation with changes in IEC 61784-3; - introduction of a secondary watchdog timer (F_WD_Time_2) to cover the use cases 'configuration-in-run', or 'maintenance of fault tolerance systems', or both (7.1.3, 7.2.3, 7.2.6, 8.1.1, 8.1.4, 8.1.6.2); - missing GSDL definitions conveyed from other approved documents (8.3.2.1); - missing CRC signature calculation for a GSD conveyed from other approved documents (8.3.3.3); - constraints for the parameter value assignment of the primary watchdog timer 'F_WD_Time' (9.3.3); - identification of the safety parameterization state of an F-Device or F-Module via field IM4 (signature) within the I&M functions (9.6.2); - updated documents in bibliography.
WITHDRAWN
EN 61784-3-3:2008
WITHDRAWN
EN 61784-3-3:2010
99.60
Withdrawal effective
Nov 10, 2020
WITHDRAWN
EN 61784-3-3:2017