EN 61158-4-2:2012

Industrial communication networks - Fieldbus specifications - Part 4-2: Data-link layer protocol specification - Type 2 elements EN 61158-4-2:2012

Publication date:   Aug 15, 2012

General information

99.60 Withdrawal effective   Sep 19, 2017

CENELEC

CLC/TC 65X Industrial-process measurement, control and automation

European Norm

25.040.40   Industrial process measurement and control | 35.100.20   Data link layer | 35.110   Networking

Buying

Withdrawn

Language in which you want to receive the document.

Scope

IEC 61158-4-2:2010(E) describes the protocol that provides communication opportunities to all participating data-link entities, sequentially and in a cyclic synchronous manner. Foreground scheduled access is available for time-critical activities together with background unscheduled access for less critical activities. Deterministic and synchronized transfers can be provided at cyclic intervals up to 1 ms and device separations of 25 km. This performance is adjustable dynamically and on-line by re-configuring the parameters of the local link whilst normal operation continues. By similar means, DL connections and new devices may be added or removed during normal operation. This protocol provides means to maintain clock synchronization across an extended link with a precision better than 10 s. This second edition cancels and replaces the first edition published in 2007 and constitutes a technical revision. The main changes with respect to the previous edition are: -Clause 2 and Bibliography: update of normative and bibliographic references; - subclause 3.5: update of abbreviations; - subclause 7.6: updates of the Ethernet Link object; - subclause 7.7: minor update of the Devicenet object (additional attribute); - new subclauses 7.9 and 7.10: new DLR and QoS objects; - new Clause 10: new DLR protocol.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 61158-4-2:2008

NOW

WITHDRAWN
EN 61158-4-2:2012
99.60 Withdrawal effective
Sep 19, 2017

REVISED BY

WITHDRAWN
EN 61158-4-2:2014