EN 50342-1:2015/A2:2021

Lead-acid starter batteries - Part 1: General requirements and methods of test EN 50342-1:2015/A2:2021

Publication date:   Mar 23, 2022

General information

60.60 Standard published   Oct 8, 2021

CENELEC

CLC/TC 21X Secondary cells and batteries

European Norm

29.220.20   Acid secondary cells and batteries

Buying

Published

Language in which you want to receive the document.

Scope

TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018
- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.
- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Life cycle

PREVIOUSLY

PUBLISHED
EN 50342-1:2015

NOW

PUBLISHED
EN 50342-1:2015/A2:2021
60.60 Standard published
Oct 8, 2021