90.60 Close of review Jun 4, 2018
CEN/CENELEC
CEN/CLC/JTC 2 Power Engineering
European Norm
27.040 Gas and steam turbines. Steam engines | 27.100 Power stations in general
Published
This standard gives guidance on writing the technical specification for the procurement of coal handling and bulk storage plant, associated with steam generating plant in the electrical power supply industry. This includes: wagon unloaders or wagon tipplers; barges or ship unloaders; coal stackers and coal reclaimers (bucket wheels, scrapers) of the coal yard; hoppers; silos for coal mixing, buffer silos, bunkers (boiler house silos); transfer towers between belt conveyors; belt conveyors, bucket elevators; metal structures (towers, conveyor tunnels)...
Legislation related to this standard
Procurement procedures of entities operating in the water, energy, transport and telecommunications sectors
PUBLISHED
EN 45510-4-5:2002
90.60
Close of review
Jun 4, 2018