This document gives guidelines for the design, construction and operation of all onshore liquefied natural gas (LNG) installations for
the liquefaction, storage, vaporization, transfer and handling of LNG and natural gas (NG).
This document is applicable for plants with an LNG storage capacity above 200 t.
The designated boundary limits are LNG inlet/outlet by the ship’s manifold including vapour return connection, the truck
loading/unloading connection including vapour return, the rail car loading/unloading connection including vapour return and the natural gas in and outlet boundary by piping systems.
Terminals or plant types have one or more boundary limits as described in this scope (see Figure 1).
A short description of each of these installations is given in Annex G.
Feed gas for LNG liquefaction installations (plant) can be from gas field, associated gas from oil field, piped gas from transportation
grid or from renewables.
Floating solutions (for example FPSO, FSRU, SRV), whether off-shore or near-shore, are not covered by this document even if some
concepts, principles or recommendations could be applied. However, in case of berthed FSRU with LNG transfer across the jetty, the
following recommendations apply for the jetty and topside facilities.
In case of solutions using floating storage unit (FSU) and land-based re-gasification solution, the on-shore part is covered by these
standard recommendations.
Plants with a storage inventory from 5 t up to 200 t are covered by [5].
General Individual work items to be attended as per context and purpose above as well as draft for amendment (N349 /N350), including but not limited to:
- Safety distances
- Fire protection systems
- Unmanned transfer stations
- Abnormal conditions
- Accidental conditions
- Threshold values
- Bibliography.