EN 13674-2:2006+A1:2010

Railway applications - Track - Rail - Part 2: Switch and crossing rails used in conjunction with Vignole railway rails 46 kg/m and above EN 13674-2:2006+A1:2010

Publication date:   Aug 20, 2010

General information

99.60 Withdrawal effective   Oct 2, 2019

CEN

CEN/TC 256 Railway applications

European Norm

93.100   Construction of railways

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This part of EN 13674 specifies switch and crossing rails that carry railway wheels. These are used in conjunction with Vignole railway rails.
This part of this standard is not applicable for the check rails that do not carry railway wheels.
Eight pearlitic steel grades are specified covering a hardness range of 200 HBW to 390 HBW and include non heat treated non-alloy steels, non heat treated alloy steels, heat treated non-alloy steels and heat treated low alloy steels.
There are !34 rail profiles" specified in this standard, but they may not all be available in all steel grades.
Rails specified in EN 13674-1 may also be used as switch and crossing rails and if so used they shall comply with the requirements of
EN 13674-1.

Related legislation

Legislation related to this standard

96/48/EC

Interoperability of the trans-European high-speed rail system

2008/57/EC

DIRECTIVE 2008/57/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 June 2008 on the interoperability of the rail system within the Community (Recast)

Harmonized/Supporting

Life cycle

NOW

WITHDRAWN
EN 13674-2:2006+A1:2010
99.60 Withdrawal effective
Oct 2, 2019

REVISED BY

PUBLISHED
EN 13674-2:2019