Withdrawn
The present document "Cost and schedule management", is part of a collection of space standards belonging to the management branch. The requirements specified herein apply to, and affect the customer and supplier at all levels, when the capability to design and supply conforming product needs to be demonstrated. These requirements, as tailored in related project requirements document, are applicable to any actor of a space project.
WITHDRAWN
EN 13290-7:2001
99.60
Withdrawal effective
Aug 20, 2014
PUBLISHED
EN 16601-60:2014