EN 12063:2024

Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls EN 12063:2024

Publication date:   Jul 16, 2020

General information

60.55 Ratification completed (DOR)   Apr 15, 2024

CEN

CEN/TC 288 Execution of special geotechnical works

European Norm

93.020   Earthworks. Excavations. Foundation construction. Underground works

Buying

Draft

Language in which you want to receive the document.

Scope

This document specifies requirements, recommendations and information concerning the execution of permanent or temporary sheet pile wall, combined pile walls, high modulus wall structures and the handling of equipment and materials.
This document does not give requirements and recommendations for the installation of specific parts of the structure such as ground anchorages, displacement piles and micropiles which are covered by other documents.
This document is applicable to steel sheet pile walls, combined walls, high modulus walls, and synthetic sheet pile walls (composite), precast concrete and timber sheet pile walls. Tubular piles included in combined walls and high modulus walls can be filled with concrete.
Composite structures such as Berliner walls and sheet pile walls in combination with shotcrete, are not covered by this document.

Life cycle

PREVIOUSLY

PUBLISHED
EN 12063:1999

NOW

IN_DEVELOPMENT
EN 12063:2024
60.55 Ratification completed (DOR)
Apr 15, 2024