99.60 Withdrawal effective Jun 28, 2023
CEN
CEN/WS 064 Phase 1 Design and Construction Code for mechanical equipments of innovative nuclear installations (European Sustainable Nuclear Industrial Initiative)
CEN/CENELEC Workshop Agreement
27.120.01 Nuclear energy in general
This CEN Workshop Agreement compiles short term modification requests intended to be part of the revision of the RCC-MRx design code edition 2012.
The modification requests made through this document are not intended to be mandatorily included into the revised version of RCC-MRx. Only proposals, made through a proper Instruction Files and approved by AFCEN are to be included into the RCC-MRx 2012 version.
WITHDRAWN
CWA 16519:2012
99.60
Withdrawal effective
Jun 28, 2023