IEC 60071-12:2022 ED1

Insulation co-ordination - Part 12: Application guidelines for LCC HVDC converter stations IEC 60071-12:2022 ED1

Publication date:   Oct 14, 2022

General information

60.60 Standard published   Oct 14, 2022

IEC

TC 99

International Standard

29.080.30   Insulation systems

Buying

Published

Language in which you want to receive the document.

Scope

IEC 60071-12:2022 applies guidelines on the procedures for insulation co-ordination of line commutated converter (LCC) stations for high-voltage direct current (HVDC) project, whose aim is evaluating the overvoltage stresses on the converter station equipment subjected to combined DC, AC power frequency, harmonic and impulse voltages, and determining the specified withstand voltages for equipment.
This document deals only with metal-oxide surge arresters, without gaps, which are used in modern HVDC converter stations. The criteria for determining the protective levels of series and/or parallel combinations of surge arresters used to ensure optimal protection are also presented. Typical arrester protection schemes and stresses of arresters are presented.
Annex A contains examples of insulation co-ordination for LCC HVDC converters which support the concepts described in the main text, and the basic analytical techniques used.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 60071-5:2014 ED1

NOW

PUBLISHED
IEC 60071-12:2022 ED1
60.60 Standard published
Oct 14, 2022