FprEN 16494

Railway applications - Requirements for ERTMS Trackside Boards FprEN 16494

Publication date:   Nov 3, 2022

General information

45.99 Dispatch of FV draft to CCMC   Mar 27, 2024

CEN

CEN/TC 256 Railway applications

European Norm

03.220.30   Transport by rail | 33.070.50   Global System for Mobile Communication (GSM)

Buying

Draft

Language in which you want to receive the document.

Scope

This document is applicable to the heavy rail system.
This document defines the requirements for the provision, visibility, readability, maintenance and testing of a specific set of ERTMS trackside boards associated with the following DMI and ETCS track conditions:
— ETCS stop marker
— ETCS location marker
— level transition, corresponding to transitions between ETCS levels
— lower pantograph
— pantograph lowered
— raise pantograph
— neutral section announcement
— neutral section
— end of neutral section
— GSM-R network border marker
— no traction system fitted announcement
— no traction system fitted indication
— traction system AC 25 kV 50 Hz announcement
— traction system AC 25 kV 50 Hz indication
— traction system AC 15 kV 16,7 Hz announcement
— traction system AC 15 kV 16,7 Hz indication
— traction system DC 3 kV announcement
— traction system DC 3 kV indication
— traction system DC 1,5 kV announcement
— traction system DC 1,5 kV indication
— traction system DC 600/750 V announcement
— traction system DC 600/750 V indication
— activate the audible warning device (horn) indication
— safe stopping area announcement
— safe stopping area indication for start
— safe stopping area indication for end
— inhibition of brake announcement/indication for start/indication for revocation
— level crossing marker
NOTE 1 the brake MBs apply for any of the three brake types (eddy current, magnetic shoe, regenerative), whereas the exact type concerned would be known by the driver via existing Route knowledge.
The following ETCS track conditions are outside the scope of this Standard:
— Safe stopping area semi-continuous indication for in-between
— Non-stopping area announcement
— Non-stopping area announcement
— Non stopping area indication for start
— Non stopping area indication for end
— Non stopping area semi-continuous indication for in-between
— Close air conditioning intake announcement
— Close air conditioning intake indication
— Open air conditioning intake announcement
— Open air conditioning intake indication
This document includes the arrangement of the boards and their interface with existing systems (track, cab design including cab sight lines, visibility by the driver and train head lamps).
Mobile, backlit and temporary signs are not within the scope of this document.
The application of ERTMS trackside boards is not within the scope of this document.
Sighting requirements are not within the scope of this document. The sighting process needs to be implemented in accordance with national rules.

Related legislation

Legislation related to this standard

2016/797/EU

Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (Text with EEA relevance)

Life cycle

PREVIOUSLY

PUBLISHED
EN 16494:2015

NOW

IN_DEVELOPMENT
FprEN 16494
45.99 Dispatch of FV draft to CCMC
Mar 27, 2024