EN 13480-6:2012

Metallic industrial piping - Part 6: Additional requirements for buried piping EN 13480-6:2012

Publication date:   Aug 15, 2012

General information

99.60 Withdrawal effective   Jun 28, 2017

CEN

CEN/TC 267 Industrial piping and pipelines

European Norm

23.040.01   Pipeline components and pipelines in general

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This European Standard specifies requirements for industrial piping either totally buried or partly buried and partly run in sleeves or similar protection. It is used in conjunction with the other six parts of
EN 13480.
Where buried piping subject to this standard connects to piping installed under other jurisdiction such as pipelines, the transition should be made at a closing element e.g. an isolating or regulating valve separating the two sections. This should be close to the boundary of the industrial site, but may be inside or outside the boundary.
Operating temperature up to 75 °C.
NOTE For higher temperatures reference should be made to EN 13941, but it should be kept in mind, that CEN/TC 107 only deals with pre-insulated piping with temperatures up to 140 °C and diameters up to 800 mm, which is state of the art for these products.

Related legislation

Legislation related to this standard

97/23/EC

Pressure equipment

Harmonized/Supporting
2014/68/EU

Directive 2014/68/EU of the European Parliament and of the Council of 15 May 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of pressure equipment

Harmonized/Supporting

Life cycle

PREVIOUSLY

WITHDRAWN
EN 13480-6:2004

WITHDRAWN
EN 13480-6:2004/A1:2005

NOW

WITHDRAWN
EN 13480-6:2012
99.60 Withdrawal effective
Jun 28, 2017

CORRIGENDA / AMENDMENTS

WITHDRAWN
EN 13480-6:2012/A1:2016

REVISED BY

PUBLISHED
EN 13480-6:2017