Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Continuous handling equipment and systems - Safety and EMC requirements for equipment for mechanical handling of bulk materials except fixed belt conveyors
00.60 Close of review
Agricultural and forestry machinery - Electromagnetic compatibility - Part 1: General EMC requirements (ISO/FDIS 14982-1:2025)
45.99 Dispatch of FV draft to CCMC
Electrical requirements for lifts, escalators and moving walks - Part 1: Electromagnetic compatibility with regard to emissions (ISO/DIS 8102-1:2025)
40.60 Close of voting
Electrical requirements for lifts, escalators and moving walks - Part 2: Electromagnetic compatibility with regard to immunity (ISO/DIS 8102-2:2025)
40.60 Close of voting
Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-1: Radio disturbance and immunity measuring apparatus - Measuring apparatus
10.99 New project approved
Electromagnetic compatibility (EMC) - Part 3-2: Limits – Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
10.99 New project approved
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment
10.99 New project approved
Instrument transformers - Part 13: Stand-alone merging unit (SAMU)
10.99 New project approved
Radio-frequency disturbance characteristics - Limits and methods of measurement (Requirements for air-gap wireless power transfer (WPT) for electric vehicle (EV))
10.99 New project approved
Switches for household and similar fixed electrical installations - Part 2-1: Particular requirements - Electronic control devices
10.99 New project approved
Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: Emission
10.99 New project approved
Semiconductor converters - Part 2: Self-commutated semiconductor converters including direct DC converters
10.99 New project approved
Telecontrol equipment and systems - Part 2-1: Operating conditions - Power supply and electromagnetic compatibility
10.99 New project approved
Low-voltage switchgear and controlgear - Part 5-2: Control circuit devices and switching elements - Proximity switches
10.99 New project approved
Electromagnetic compatibility (EMC) - Part 4-7: Testing and measurement techniques - General guide on harmonics and interharmonics measurements and instrumentation, for power supply systems and equipment connected thereto
10.99 New project approved
Electromagnetic compatibility (EMC) - Part 6-5: Generic standards - Immunity for equipment used in power station and substation environment
10.99 New project approved
Low-voltage switch mode power supplies - Part 3: Electromagnetic compatibility (EMC)
10.99 New project approved
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
10.99 New project approved