Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Buildings and civil engineering works — Modular coordination — Module
90.60 Close of review
Building construction — Modular coordination — Principles and rules
90.93 Standard confirmed
Building construction — Modular co-ordination — Stairs and stair openings — Co-ordinating dimensions
90.60 Close of review
Building construction — Modular coordination — Modular floor plane for vertical dimensions
90.60 Close of review
Performance standards in building — Presentation of performance levels of facades made of same-source components
90.93 Standard confirmed
Joints in building — Principles for jointing of building components — Accommodation of dimensional deviations during construction
90.60 Close of review
Typical horizontal joints between an external wall of prefabricated ordinary concrete components and a concrete floor — Properties, characteristics and classification criteria
60.60 Standard published
Typical vertical joints between two prefabricated ordinary concrete external wall components — Properties, characteristics and classification criteria
60.60 Standard published
Prefabricated building — Part 1: Vocabulary
20.00 New project registered in TC/SC work programme
Prefabricated building — Part 2: General principles
20.00 New project registered in TC/SC work programme
Prefabricated building — Volumetric prefabricated building — Concepts and general principles
40.00 DIS registered
Prefabricated Building - Modular Building - Design
30.60 Close of voting/ comment period
Prefabricated Building - Modular Building - Kitchen and Bathroom
30.60 Close of voting/ comment period
Prefabricated Building — Application of Digital Product Passport(DPP)in construction industry — Part 1: Principles for modular product application
20.60 Close of comment period
Prefabricated Steel Structures — Layered Assembly System and Design
20.20 Working draft (WD) study initiated
Prefabricated building - Modular building - Hoisting
00.00 Proposal for new project received