Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Steel for the reinforcement of concrete — Part 1: Plain bars
90.93 Standard confirmed
Steel for the reinforcement of concrete — Part 2: Ribbed bars
60.60 Standard published
Steel for the reinforcement of concrete — Part 3: Welded fabric
60.60 Standard published
Typical horizontal joints between an external wall of prefabricated ordinary concrete components and a concrete floor — Properties. characteristics and classification criteria
90.92 Standard to be revised
Typical vertical joints between two prefabricated ordinary concrete external wall components — Properties, characteristics and classification criteria
90.92 Standard to be revised
Grooved vertical joints with connecting bars and concrete infill between large reinforced concrete panels — Laboratory mechanical tests — Effect of tangential loading
90.93 Standard confirmed
Horizontal joints between load-bearing walls and concrete floors — Laboratory mechanical tests — Effect of vertical loading and of moments transmitted by the floors
90.93 Standard confirmed
Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures
30.60 Close of voting/ comment period
Environmental management for concrete and concrete structures — Part 2: System boundary and inventory data
40.99 Full report circulated: DIS approved for registration as FDIS
Performance requirements for standards on concrete structures
40.20 DIS ballot initiated: 12 weeks
Steel for the prestressing of concrete — Part 2: Cold-drawn wire
40.60 Close of voting
Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 1: Test method for thermal stability
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 5: Test method for watertightness
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 6: Test method for response to the substrate movement
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Steel for the prestressing of concrete — Part 5: Hot-rolled steel bars with or without subsequent processing
50.00 Final text received or FDIS registered for formal approval
Paints and varnishes — Protective coatings for concrete structures — Part 1: General introduction
50.00 Final text received or FDIS registered for formal approval
General practices for the repair of water-leakage cracks in concrete structures
60.60 Standard published
Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 1: Test method for thermal stability
90.92 Standard to be revised