Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
GRP tanks and vessels for use above ground - Part 3: Design and workmanship
40.60 Close of voting
Copper and copper alloys - Seamless, round copper tubes for medical gases or vacuum
00.60 Close of review
Unfired pressure vessels - Part 12: Additional requirements for pressure vessels of copper and copper alloys
40.60 Close of voting
Unfired pressure vessels - Part 14: Additional requirements for pressure equipment and pressure components fabricated with additive manufacturing methods
20.60 Close of comment period
Metallic industrial piping - Part 3: Design and calculation
10.99 New project approved
Metallic industrial piping - Part 4: Fabrication and installation
10.99 New project approved
Metallic industrial piping - Part 5: Inspection and testing
10.99 New project approved
Metallic industrial piping - Part 6: Additional requirements for buried piping
10.99 New project approved
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping
10.99 New project approved
Pressure regulators, automatic change-over devices, having a maximum regulated pressure of 4 bar, with a maximum capacity of 150 kg/h, associated safety devices and adaptors for butane, propane, and their mixtures
10.99 New project approved
Industrial valves - Requirements and testing for metallic valves as pressure accessories
45.99 Dispatch of FV draft to CCMC
Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 3: Copper alloy flanges
40.60 Close of voting