Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Geotechnical investigation and testing — Testing of geotechnical structures — Part 5: Testing of grouted anchors
90.93 Standard confirmed
Geotechnics — Array measurement of microtremors to estimate shear wave velocity profile
60.60 Standard published
Geotechnical investigation and testing -Geotechnical monitoring by field instrumentation — Part 6: Measurement of settlement: Hydraulic settlement systems
20.00 New project registered in TC/SC work programme
Geotechnical investigation and testing -Geotechnical monitoring by field instrumentation — Part 9: Measurement of displacements by geodetic means
20.00 New project registered in TC/SC work programme
Geotechnical investigation and testing — Testing of geotechnical structures — Part 6: Load testing of soil nails and rock bolts
30.60 Close of voting/ comment period
Geotechnical investigation and testing — Geotechnical monitoring by field instrumentation — Part 7: Measurement of strains: Strain gauges
40.60 Close of voting
Geotechnical investigation and testing — Laboratory testing of soil — Part 13: Swelling test for Soils, Hard Soils and Soft Rocks — Procedure with cycles on a single specimen
10.20 New project ballot initiated
Geotechnical investigation and testing — Qualification criteria and assessment — Part 1: Qualified technician and qualified operator
60.60 Standard published
Geotechnical investigation and testing — Qualification criteria and assessment — Part 2: Responsible expert
60.60 Standard published
Geotechnical investigation and testing — Qualification criteria and assessment — Part 3: Qualified enterprise
60.60 Standard published
Geotechnical investigation and testing — Laboratory testing of rock — Part 1: Determination of water content
20.20 Working draft (WD) study initiated
Geotechnical investigation and testing — Laboratory testing of rock — Part 2: Determination of bulk density
20.20 Working draft (WD) study initiated