Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Railway applications - Wheelsets and bogies - Structural requirements of bogie frames
00.60 Close of review
Respiratory protective devices - Self-contained closed-circuit breathing apparatus for escape - Requirements, testing and marking
40.60 Close of voting
Railway applications - Track - Track geometry quality - Part 4: Measuring systems - Manual and lightweight devices
40.60 Close of voting
Railway applications - Infrastructure - Railbound construction and maintenance machines - Part 1: Technical requirements for running
20.60 Close of comment period
Railway applications - Aerodynamics - Part 6: Requirements and test procedures for cross wind assessment
00.60 Close of review
Railway applications - Braking - Requirements for the brake system of trains hauled by locomotives
40.60 Close of voting
Railway applications - Testing and Simulation for the assessment of running characteristics of railway vehicles operated on the heavy rail network - Part 1: General
20.60 Close of comment period
Railway applications — Testing and Simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network — Part 2: Safety against derailment on twisted track
10.99 New project approved
Railway applications — Testing and Simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network — Part 4: On-track testing
10.99 New project approved
Railway applications — Testing and Simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network — Part 5: Calculations/Simulations
10.99 New project approved
Railway applications - Infrastructure - Flash butt welding of rails - Part 3: Welding in association with crossing construction
10.99 New project approved
Railway applications - Bodyside entrance systems for rolling stock
40.20 DIS ballot initiated: 12 weeks
Railway applications - Gauges - Part 1: General - Common rules for Rolling Stock and Infrastructure
40.60 Close of voting
Railway applications - Gauges - Part 4: Catalogue of defined gauges
40.60 Close of voting
Railway applications - Infrastructure - Restoration of rails by electric arc welding
10.99 New project approved