Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Pressure equipment - Part 1: Vocabulary
50.60 Close of voting. Proof returned by secretariat
Pressure equipment - Part 4: Establishment of technical delivery conditions for metallic materials
90.60 Close of review
Pressure equipment - Part 5: Inspection documentation of metallic materials and compliance with the material specification
90.60 Close of review
Pressure equipment - Part 7: Safety systems for unfired pressure equipment
90.93 Standard confirmed
Pressure equipment - Part 7: Safety systems for unfired pressure equipment
60.60 Standard published
Unfired pressure vessels - Part 11: Additional requirements for pressure vessels of titanium and titanium alloys
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Simple unfired pressure vessels designed to contain air or nitrogen - Part 1: Pressure vessels for general purposes
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 2: Pressure vessels for air braking and auxiliary systems for motor vehicles and their trailers
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 3: Steel pressure vessels designed for air braking equipment and auxiliary pneumatic equipment for railway rolling stock
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 4: Aluminium alloy pressure vessels designed for air braking equipment and auxiliary pneumatic equipment for railway rolling stock
60.55 Ratification completed (DOR)
Pressure equipment - Part 7: Safety systems for unfired pressure equipment
45.99 Dispatch of FV draft to CCMC
Unfired pressure vessels - Part 12: Additional requirements for pressure vessels of copper and copper alloys
40.60 Close of voting
Unfired pressure vessels - Part 14: Additional requirements for pressure equipment and pressure components fabricated with additive manufacturing methods
20.60 Close of comment period