Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Execution of special geotechnical works - Reinforced fill
60.60 Standard published
Manually operated hydraulic shoring systems for groundwork support - Part 1: Product specifications
90.93 Standard confirmed
Manually operated hydraulic shoring systems for groundwork support - Part 2: Assessment by calculation or test
90.93 Standard confirmed
Execution of special geotechnical works - Deep mixing
60.60 Standard published
Execution of special geotechnical works - Ground treatment by deep vibration
90.92 Standard to be revised
Execution of special geotechnical work - Bored piles
90.92 Standard to be revised
Execution of special geotechnical work - Bored piles
50.60 Close of voting. Proof returned by secretariat
Execution of special geotechnical work - Diaphragm walls
90.92 Standard to be revised
Execution of special geotechnical works - Diaphragm walls
50.60 Close of voting. Proof returned by secretariat
Drilling and foundation equipment - Safety - Part 1: Common requirements
60.60 Standard published
Drilling and foundation equipment - Safety - Part 1: Common requirements
50.60 Close of voting. Proof returned by secretariat
Drilling and foundation equipment - Safety - Part 2: Mobile drill rigs for civil and geotechnical engineering, quarrying and mining
60.60 Standard published
Drilling and foundation equipment - Safety - Part 2: Mobile drill rigs for civil and geotechnical engineering in soil or soil and rock mixture
50.60 Close of voting. Proof returned by secretariat
Drilling and foundation equipment - Safety - Part 3: Horizontal directional drilling equipment (HDD)
60.60 Standard published