Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Industrial trucks — Verification of stability — Part 13: Rough-terrain trucks with mast — Technical Corrigendum 1
60.60 Standard published
Industrial trucks — Verification of stability — Part 14: Rough-terrain variable-reach trucks
90.93 Standard confirmed
Industrial trucks — Verification of stability — Part 24: Slewing variable-reach rough-terrain trucks
90.93 Standard confirmed
Rough-terrain trucks — Operator training — Content and methods
60.60 Standard published
Energy efficiency of industrial trucks — Test methods — Part 4: Variable-reach rough-terrain trucks
20.00 New project registered in TC/SC work programme
Industrial trucks — Verification of stability — Part 23: Lorry-mounted trucks
30.00 Committee draft (CD) registered
Rough-terrain trucks — Safety requirements and verification — Part 2: Slewing trucks
40.00 DIS registered
Industrial trucks — Verification of stability — Part 13: Rough-terrain trucks with mast
40.20 DIS ballot initiated: 12 weeks
Industrial trucks — Verification of stability — Part 25: Rough-terrain variable-reach trucks operating in the special condition of handling freely suspended loads
40.20 DIS ballot initiated: 12 weeks
Rough-terrain trucks — Safety requirements and verification — Part 8: Requirements for trucks designed for towing
50.00 Final text received or FDIS registered for formal approval
Rough-terrain trucks — Safety requirements and verification — Part 4: Additional requirements for variable-reach trucks handling freely suspended loads
00.00 Proposal for new project received