Standards search

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Temporary edge protection systems - Product specification - Test methods

90.93 Standard confirmed

CEN/TC 53

Temporary edge protection systems - Product specification - Test methods

40.60 Close of voting

CEN/TC 53

Temporary edge protection systems - Product specification - Test methods

60.55 Ratification completed (DOR)

CEN/TC 53

Prefabricated timber formwork beams - Requirements, classification and assessment

90.60 Close of review

CEN/TC 53

Manually operated hydraulic shoring systems for groundwork support - Part 1: Product specifications

90.93 Standard confirmed

CEN/TC 53

Manually operated hydraulic shoring systems for groundwork support - Part 2: Assessment by calculation or test

90.93 Standard confirmed

CEN/TC 53

Adjustable telescopic aluminium props - Product specifications, design and assessment by calculation and tests

90.93 Standard confirmed

CEN/TC 53

Temporary works equipment - Encapsulation constructions - Performance requirements and general design

90.93 Standard confirmed

CEN/TC 53

Temporary works equipment - Execution - Requirements for manufacturing

60.60 Standard published

CEN/TC 53

Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 1: Couplers for tubes - Requirements and test procedures

60.60 Standard published

CEN/TC 53

Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 1: Couplers for tubes - Requirements and test procedures

10.99 New project approved

CEN/TC 53

Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 2: Special couplers - Requirements and test procedures

60.60 Standard published

CEN/TC 53

Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 3: Plain base plates and spigot pins - Requirements and test procedures

90.60 Close of review

CEN/TC 53

Low height mobile working platform - Materials, dimensions, design loads, safety and performance requirements

40.60 Close of voting

CEN/TC 53

Couplers, loose spigots and base plates for use in working scaffolds made of steel tubes - requirements and test procedures

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CEN/TC 53