Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Unfired pressure vessels - Part 4: Fabrication
10.99 New project approved
Unfired pressure vessels - Part 5: Inspection and testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys
40.60 Close of voting
Metallic industrial piping - Part 3: Design and calculation
20.60 Close of comment period
Metallic industrial piping - Part 3: Design and calculation
00.60 Close of review
Metallic industrial piping - Part 4: Fabrication and installation
00.60 Close of review
Metallic industrial piping - Part 5: Inspection and testing
00.60 Close of review
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping
00.60 Close of review
Safety and control devices for burners and appliances burning gaseous and/or liquid fuels - General requirements
40.60 Close of voting
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment
50.60 Close of voting. Proof returned by secretariat
Pressure equipment for refrigerating systems and heat pumps - Part 1: Vessels - General requirements
40.60 Close of voting
Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements
40.60 Close of voting
Gas safety shut-off devices for inlet pressure up to 10 MPa (100 bar)
60.55 Ratification completed (DOR)
Metal bellows expansion joints for pressure applications
10.99 New project approved
Industrial valves - Requirements and testing for metallic valves as pressure accessories
50.60 Close of voting. Proof returned by secretariat
Gas pressure regulators for inlet pressure up to 10 MPa (100 bar)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks