Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Sterilizers for medical purposes - Ethylene oxide sterilizers - Requirements and test methods
50.60 Close of voting. Proof returned by secretariat
Manufacturing Message Specification - General applications - Base profile - Part 1: Specifications of ACSE, presentation and session protocols for the use by MMS
20.60 Close of comment period
Manufacturing Message Specification - General applications - Base profile - Part 2: Common MMS requirements
10.99 New project approved
Manufacturing Message Specification - General applications - Base profile - Part 3: Specific MMS requirements
10.99 New project approved
Materials obtained from end of life tyres - Part 1: General definitions related to the methods for determining their dimension(s) and impurities
40.60 Close of voting
Materials obtained from end of life tyres - Part 3: Shreds, cuts and chips - Methods for determining their dimension(s) including protruding filaments dimensions
30.99 CD approved for registration as DIS
Pressure equipment for refrigerating systems and heat pumps - Part 1: Vessels - General requirements
40.60 Close of voting
Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements
40.60 Close of voting
Bitumens and bituminous binders - Determination of residue on sieving of bituminous emulsions and determination of storage stability by sieving
40.60 Close of voting
Chemical disinfectants and antiseptics - Quantitative suspension test for the evaluation of tuberculocidal or mycobactericidal activity in the medical area - Test methods and requirements (phase 2, step 1)
40.20 DIS ballot initiated: 12 weeks
Gas-loaded accumulators for fluid power applications
40.20 DIS ballot initiated: 12 weeks
Railway applications — Testing and simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network — Part 1: General
45.99 Dispatch of FV draft to CCMC
Railway applications - Testing and simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network - Part 2: Safety against derailment on twisted track
45.99 Dispatch of FV draft to CCMC
Railway applications - Testing and simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network - Part 3: Stationary tests not obligatory on a European level
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - Testing and simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network - Part 4: On-track testing
45.99 Dispatch of FV draft to CCMC
Railway applications - Testing and simulation for the assessment of running characteristics of rail vehicles operated on the heavy rail network - Part 5: Calculations/Simulations
45.99 Dispatch of FV draft to CCMC
Railway applications - Testing and simulation for the assessment of running characteristics of railway vehicles operated on the heavy rail network - Part 6: Technical Report providing background information to the EN 14363 series of standards
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks