Standards search

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Adhesives - Test method for cementitious and calcium sulfate-based floor levelling compounds - Determination of bond strength

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CEN/TC 193

Adhesives - Test method for cementitious and calcium sulfate-based floor levelling compounds - Determination of setting time

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CEN/TC 193

Unfired pressure vessels - Part 12: Additional requirements for pressure vessels of copper and copper alloys

40.60   Close of voting

CEN/TC 54

Unfired pressure vessels - Part 14: Additional requirements for pressure equipment and pressure components fabricated with additive manufacturing methods

45.99   Dispatch of FV draft to CCMC

CEN/TC 54

Unfired pressure vessels - Part 2: Materials

40.60   Close of voting

CEN/TC 54

Unfired pressure vessels - Part 4: Fabrication

30.99   CD approved for registration as DIS

CEN/TC 54

Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys

45.99   Dispatch of FV draft to CCMC

CEN/TC 54

Aggregates for railway ballast - Part 1: Characteristics

40.60   Close of voting

CEN/TC 154

Aggregates for railway ballast - Part 2: Complementary information

40.60   Close of voting

CEN/TC 154

Railway applications - Braking - Urban rail brake systems - Part 1: Requirements and definitions

40.60   Close of voting

CEN/TC 256

Railway applications - Braking - Urban rail brake systems - Part 2: Test methods

40.60   Close of voting

CEN/TC 256

Non-destructive testing - Acoustic emission testing - Equipment characterization - Part 1: Equipment description

40.60   Close of voting

CEN/TC 138

Metallic industrial piping - Part 15: Additional requirements for hydrogen applications

40.10   harmonizedStageCodeLabel.40.10

CEN/TC 267

Metallic industrial piping - Part 2: Materials

40.60   Close of voting

CEN/TC 267

Metallic industrial piping - Part 3: Design and calculation

20.60   Close of comment period

CEN/TC 267

Metallic industrial piping - Part 4: Fabrication and installation

40.60   Close of voting

CEN/TC 267

Metallic industrial piping - Part 5: Inspection and testing

40.60   Close of voting

CEN/TC 267

Metallic industrial piping - Part 9: Additional requirements for nickel and nickel alloys piping

45.99   Dispatch of FV draft to CCMC

CEN/TC 267



Access Genorma App Everywhere

Get fast and easy access to top European and International standards (EN, ISO, IEC) via your mobile phone, tablet or the web.