Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Thermal performance of buildings - Determination of air permeability of buildings - Fan pressurization method (ISO 9972:2015)
60.60 Standard published
Connections for general use and fluid power - Ports and stud ends with ISO 261 threads with elastomeric or metal-to-metal sealing - Part 1: Threaded ports (ISO 9974-1:1996)
90.93 Standard confirmed
Connections for general use and fluid power - Ports and stud ends with ISO 261 threads with elastomeric or metal-to-metal sealing - Part 2: Stud ends with elastomeric sealing (type E) (ISO 9974-2:1996)
90.93 Standard confirmed
Connections for general use and fluid power - Ports and stud ends with ISO 261 threads with elastomeric or metal-to-metal sealing - Part 3: Stud ends with metal-to-metal sealing (type B) (ISO 9974-3:1996)
90.93 Standard confirmed
Radiation protection - Sealed sources - Leakage test methods (ISO 9978:2020)
60.60 Standard published
Specification for mortar for masonry - Part 1: Rendering and plastering mortar
90.93 Standard confirmed
Specification for mortar for masonry - Part 2: Masonry mortar
90.93 Standard confirmed
Assistive products - Classification and terminology (ISO 9999:2022)
60.60 Standard published
Wood preservatives - Determination of preventive action against Reticulitermes Santonensis de Feytaud (Laboratory method)
60.55 Ratification completed (DOR)
Gas burning appliances for instantaneous production of hot water for domestic use - Amendment 6 to EN 26
40.20 DIS ballot initiated: 12 weeks
Technical Report concerning a proposal regarding inclusion of organo-mineral fertilizers into annexes of Directive 76/116/EEC
20.60 Close of comment period
Model steam engines and internal combustion engines for models
45.99 Dispatch of FV draft to CCMC
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 10: Multiple controls
40.20 DIS ballot initiated: 12 weeks
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 11: Water sprayers
40.20 DIS ballot initiated: 12 weeks
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 1: Sprinklers
40.20 DIS ballot initiated: 12 weeks