IEC TS 62738:2018 ED1

Ground-mounted photovoltaic power plants - Design guidelines and recommendations IEC TS 62738:2018 ED1

Publication date:   Aug 15, 2018

General information

60.60 Standard published   Aug 15, 2018

IEC

TC 82

Technical Specification

27.160   Solar energy engineering

Buying

Published

Language in which you want to receive the document.

Scope

IEC TS 62738:2018(E) sets out general guidelines and recommendations for the design and installation of ground-mounted photovoltaic (PV) power plants. A PV power plant is defined within this document as a grid-connected, ground-mounted system comprising multiple PV arrays and interconnected directly to a utility’s medium voltage or high voltage grid. Additional criteria is that PV power plants are restricted from access by non-qualified persons and are continuously monitored for safety and protection, either by on-site personnel or by active remote monitoring. Technical areas addressed are those that largely distinguish PV power plants from smaller, more conventional installations, including ground mounted array configurations, cable routing methods, cable selection, overcurrent protection strategies, equipotential bonding over large geographical areas, and equipment considerations. Safety and design requirements are referenced to the applicable requirements of IEC 62548 to address distinct differences relative to the design requirements for residential, commercial and other non-power plant applications.

Life cycle

NOW

PUBLISHED
IEC TS 62738:2018 ED1
60.60 Standard published
Aug 15, 2018