IEC 61558-2-23:2010 ED2

Safety of transformers, reactors, power supply units and combinations thereof - Part 2-23: Particular requirements and tests for transformers and power supply units for construction sites IEC 61558-2-23:2010 ED2

Publication date:   Aug 31, 2010

General information

60.60 Standard published   Aug 31, 2010

IEC

TC 96

International Standard

29.180   Transformers. Reactors

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61558-2-23:2010 deals with the safety of transformers for construction sites and power supply units incorporating transformers for construction sites. Transformers incorporating electronic circuits are also covered by this standard. This second edition cancels and replaces the first edition published in 2000. It constitutes a technical revision. The main changes consist of updating this Part 2-23 in accordance with IEC 61558-1:2005. This part has the status of a group safety publication in accordance with IEC Guide 104: The preparation of safety publications and the use of basic safety publications and group safety publications. The attention of National Committees is drawn to the fact that equipment manufacturers and testing organizations may need a transitional period following publication of a new, amended or revised IEC publication in which to make products in accordance with the new requirements and to equip themselves for conducting new or revised tests. It is the recommendation of the committee that the content of this publication be adopted for implementation nationally not earlier than 12 months from the date of publication. In the meantime, the previous edition can still be ordered by contacting your local IEC member National Committee or the IEC Central Office.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61558-2-23:2000 ED1

NOW

PUBLISHED
IEC 61558-2-23:2010 ED2
60.60 Standard published
Aug 31, 2010

REVISED BY

IN_DEVELOPMENT
IEC 61558-2-23 ED3