EN 50318:2018

Railway applications - Current collection systems - Validation of simulation of the dynamic interaction between pantograph and overhead contact line EN 50318:2018

Publication date:   Jun 17, 2019

General information

60.60 Standard published   Dec 7, 2018

CENELEC

CLC/TC 9X Electrical and electronic applications for railways

European Norm

29.280   Electric traction equipment

Buying

Published

Language in which you want to receive the document.

Scope

Simulation techniques are used to assess the dynamic interaction between overhead contact lines and pantographs, as part of the prediction of current collection quality. This document specifies functional requirements for the validation of such simulation methods to ensure confidence in, and mutual acceptance of the results of the simulations.
This document deals with:
- input and output parameters of the simulation;
- comparison with line test measurements, and the characteristics of those line tests;
- validation of pantograph models;
- comparison between different simulation methods;
- limits of application of validated methods to assessments of pantographs and overhead contact lines.
This document applies to the current collection from an overhead contact line by pantographs mounted on railway vehicles. It does not apply to trolley bus systems.

Related legislation

Legislation related to this standard

2008/57/EC

DIRECTIVE 2008/57/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 June 2008 on the interoperability of the rail system within the Community (Recast)

Harmonized/Supporting
2016/797/EU

Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (Text with EEA relevance)

Life cycle

PREVIOUSLY

WITHDRAWN
EN 50318:2002

NOW

PUBLISHED
EN 50318:2018
60.60 Standard published
Dec 7, 2018

CORRIGENDA / AMENDMENTS

PUBLISHED
EN 50318:2018/A1:2022

REVISED BY

IN_DEVELOPMENT
prEN IEC 63453:2023