prCEN/TS 17240 rev

Intelligent transport systems - ESafety - ECall end to end conformance testing for IMS packet switched based systems prCEN/TS 17240 rev

General information

30.98 Project deleted   Sep 30, 2022

CEN

CEN/TC 278 Intelligent transport systems

Technical Specification

Scope

This document defines the key actors in the eCall chain of service provision using IMS over packet switched networks (such as LTE/4G) as:
1) In-vehicle system (3.20) (IVS)/vehicle,
2) Mobile network Operator (MNO),
3) Public safety answering point (3.27) (PSAP),
and to provide conformance tests for actor groups 1) - 3).
NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants (3.36), although they are the recipient of the service.
NOTE 2 Third party eCall systems (TPS eCall) are not within the scope of this deliverable. This is because the core TPS-eCall (3.32) standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider (3.29).
NOTE 3 These conformance tests are based an the appropriate conformance tests from EN 16454 which was published before Internet Protocol multimedia Systems (IMS) packet switched networks were available. This deliverable therefore replicates the appropriate tests from EN 16454 (and acknowledge their source); adapt and revise Conformance Test Protocols (CTP) from EN 16454 to an IMS paradigm; or provide new additional tests that are required for the IMS paradigm. Some 14 112-eCall (Pan European eCall) tests provided in EN 16454 are specific to GSM/UMTS circuit switched communications and not appropriate for the IMS paradigm and are therefore excluded from this deliverable.
This document therefore provides a suite of ALL conformance tests for IVS equipment, MNO's, and PSAPS, required to ensure and demonstrate compliance to CEN/TS 17184.
NOTE 4 Because in the event of non-viability or non-existence of an IMS supporting network at any particular time/location, IMS-eCall systems revert to CS networked eCall systems eCall via GSM/UMTS, IVS and PSAPs need to support, and prove compliance to both IMS and CS switched networks.
The Scope covers conformance testing (and approval) of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

Life cycle

PREVIOUSLY

PUBLISHED
CEN/TS 17240:2018

NOW

ABANDON
prCEN/TS 17240 rev
30.98 Project deleted