Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Gas turbines — Procurement — Part 1: General introduction and definitions
90.60 Close of review
Gas turbines — Procurement — Part 2: Standard reference conditions and ratings
60.60 Standard published
Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning
90.60 Close of review
Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
90.92 Standard to be revised
Gas turbines — Procurement — Part 9: Reliability, availability and maintainability
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Rules for steam turbine thermal acceptance tests - Part 0: Wide range of accuracy for various types and sizes of turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests. Part 1: Method A - High accuracy for large condensing steam turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
60.60 Standard published
Turbines and turbine sets - Measurement of emitted airborne noise - Engineering/survey method
60.60 Standard published