Projects

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Gas turbines — Procurement — Part 1: General introduction and definitions

90.60 Close of review

ISO/TC 192

Gas turbines — Procurement — Part 2: Standard reference conditions and ratings

60.60 Standard published

ISO/TC 192

Gas turbines — Procurement — Part 3: Design requirements

90.60 Close of review

ISO/TC 192

Gas turbines — Procurement — Part 4: Fuels and environment

90.93 Standard confirmed

ISO/TC 192

Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning

90.60 Close of review

ISO/TC 192

Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety

90.92 Standard to be revised

ISO/TC 192

Gas turbines — Procurement — Part 9: Reliability, availability and maintainability

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 192

Steam turbines - Part 1: Specifications

60.60 Standard published

TC 5

Rules for steam turbine thermal acceptance tests - Part 0: Wide range of accuracy for various types and sizes of turbines

60.60 Standard published

TC 5

Rules for steam turbine thermal acceptance tests. Part 1: Method A - High accuracy for large condensing steam turbines

60.60 Standard published

TC 5

Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines

60.60 Standard published

TC 5

Report on the development of cogeneration

60.60 Standard published

TC 5

Turbines and turbine sets - Measurement of emitted airborne noise - Engineering/survey method

60.60 Standard published

TC 5