Standards search

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Guide for procurement of power station equipment - Part 6-9: Turbine auxiliaries - Cooling water systems

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 6-9: Turbine auxiliaries - Cooling water systems

90.60 Close of review

CEN/CLC/JTC 2

Petroleum, petrochemical and natural gas industries — Steam turbines — Special-purpose applications

90.93 Standard confirmed

ISO/TC 67/SC 6

Turbines and turbine sets — Measurement of emitted airborne noise — Engineering/survey method

90.93 Standard confirmed

ISO/TC 192

Gas turbines — Exhaust gas emission — Part 1: Measurement and evaluation

90.60 Close of review

ISO/TC 192

Gas turbines — Exhaust gas emission — Part 2: Automated emission monitoring

90.60 Close of review

ISO/TC 192

Gas turbines — Vocabulary

90.93 Standard confirmed

ISO/TC 192

Gas turbine combined cycle power plants — Thermal performance tests

90.93 Standard confirmed

ISO/TC 192

Microturbines applications — Safety

90.93 Standard confirmed

ISO/TC 192

Gas turbine applications — Requirements for power generation

90.93 Standard confirmed

ISO/TC 192

Gas turbines — Data acquisition and trend monitoring system requirements for gas turbine installations

90.93 Standard confirmed

ISO/TC 192

Mechanical vibration — Measurement and evaluation of machine vibration — Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1 500 r/min, 1 800 r/min, 3 000 r/min and 3 600 r/min

90.93 Standard confirmed

ISO/TC 108/SC 2

Mechanical vibration — Measurement and evaluation of machine vibration — Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1 500 r/min, 1 800 r/min, 3 000 r/min and 3 600 r/min — Amendment 1

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 108/SC 2

Mechanical vibration — Measurement and evaluation of machine vibration — Part 4: Gas turbines in excess of 3 MW, with fluid-film bearings

90.93 Standard confirmed

ISO/TC 108/SC 2

Gas turbine applications — Safety

60.60 Standard published

ISO/TC 192

Gas turbine exhaust systems with or without waste heat recovery

60.60 Standard published

ISO/TC 192

Gas turbines — Acceptance tests

90.92 Standard to be revised

ISO/TC 192

Cogeneration systems — Technical declarations for planning, evaluation and procurement

90.93 Standard confirmed

ISO/TC 192