Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
60.60 Standard published
Petroleum, petrochemical and natural gas industries - Steam turbines - Special-purpose applications (ISO 10437:2003)
90.92 Standard to be revised
Water-tube boilers and auxiliary installations - Part 17: Guideline for the involvement of an inspection body independent of the manufacturer
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests - Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests - Part 0: Wide range of accuracy for various types and sizes of turbines
60.60 Standard published
Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
60.60 Standard published
Guide for procurement of power station equipment - Part 3-1: Boilers - Water tube boilers
90.60 Close of review
Guide for procurement of power station equipment - Part 3-1: Boilers - Water tube boilers
90.60 Close of review
Guide for procurement of power station equipment - Part 3-2: Boilers - Shell boilers
90.60 Close of review
Guide for procurement of power station equipment - Part 3-2: Boilers - Shell boilers
90.60 Close of review
Guide for procurement of power station equipment - Part 3-3: Boilers - Boilers with fluidized bed firing
90.60 Close of review
Guide for procurement of power station equipment - Part 3-3: Boilers - Boilers with fluidized bed firing
90.60 Close of review
Guide for procurement of power station equipment - Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant
90.60 Close of review
Guide for procurement of power station equipment - Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant
90.60 Close of review