Projects

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler

60.60 Standard published

CEN/TC 269

Petroleum, petrochemical and natural gas industries - Steam turbines - Special-purpose applications (ISO 10437:2003)

90.92 Standard to be revised

CEN/TC 12

Gas turbine applications - Safety (ISO 21789:2022)

60.60 Standard published

CEN/TC 399

Water-tube boilers and auxiliary installations - Part 17: Guideline for the involvement of an inspection body independent of the manufacturer

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CEN/TC 269

Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines

60.60 Standard published

CLC/SR 5

Rules for steam turbine thermal acceptance tests - Part 2: Method B - Wide range of accuracy for various types and sizes of turbines

60.60 Standard published

CLC/SR 5

Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines

60.60 Standard published

CLC/SR 5

Steam turbines - Part 1: Specifications

60.60 Standard published

CLC/SR 5

Rules for steam turbine thermal acceptance tests - Part 0: Wide range of accuracy for various types and sizes of turbines

60.60 Standard published

CLC/SR 5

Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines

60.60 Standard published

CLC/SR 5

Guide for procurement of power station equipment - Part 3-1: Boilers - Water tube boilers

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 3-1: Boilers - Water tube boilers

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 3-2: Boilers - Shell boilers

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 3-2: Boilers - Shell boilers

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 3-3: Boilers - Boilers with fluidized bed firing

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 3-3: Boilers - Boilers with fluidized bed firing

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant

90.60 Close of review

CEN/CLC/JTC 2

Guide for procurement of power station equipment - Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant

90.60 Close of review

CEN/CLC/JTC 2