2014/68/EU

Directive 2014/68/EU of the European Parliament and of the Council of 15 May 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of pressure equipment

This web page provides you with updated information on the European standard supporting the implementation of EU Directives and regulations. It provides, on one hand the information corresponding to the real-time status of the standards provided by CEN and CENELEC and, on the other hand, provides updated information about the status of the standards in support of the European legislation. It may happen that a standard is withdrawn by the standardisation body and remains applicable in the context of the EU legislation, unless the reference is withdrawn from the official journal.

"DISCLAIMER: This is an informative page, providing added value information on standards. Information may evolve and change subject to the publication of other legislative texts. This page has no legal validity and only informative value. Genorma.com informs its users that users of this platform are responsible for deciding the version of the standard that is applicable to their products, and not Genorma.com. As a consequence, Genorma.com users are encouraged to check the latest versions of the legal text accessible through the EUR-LEX website or the Website of the European Commission"

126 - Draft standards 240 - View all published standards related to this directive 154 - Withdrawn standards

Harmonised Standards or standards supporting the application of the EU legislation

Refrigerating systems and heat pumps - Pressure relief devices and their associated piping - Methods for calculation

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

LPG equipment and accessories - Static welded steel cylindrical pressure vessels, serially produced for the storage of Liquefied Petroleum Gas (LPG) having a volume not greater than 13 m³ - Design and manufacture

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Safety devices for protection against excessive pressure - Part 3: Safety valves and bursting disc safety devices in combination (ISO 4126-3:2020)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

LPG Equipment and accessories - Specification and testing for Liquefied Petroleum Gas (LPG) pressure vessel valves and fittings

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Pressure equipment - Part 5: Inspection documentation of metallic materials and compliance with the material specification

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Pressure equipment - Part 4: Establishment of technical delivery conditions for metallic materials

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Shell design strength - Part 2: Calculation method for steel valve shells

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 12: Requirements for grate firing systems for solid fuels for the boiler

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 14: Requirements for flue gas DENOX-systems using liquefied pressurized ammonia and ammonia water solution

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial process control valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Shell design strength - Part 1: Tabulation method for steel valve shells

90.00 Start of review/2 Year Review Enquiry

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

GRP tanks and vessels for use above ground - Part 1: Raw materials - Specification conditions and acceptance criteria

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 5: Inspection and testing

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Water-tube boilers and auxiliary installations - Part 6: Inspection during construction, documentation and marking of pressure parts of the boiler

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Water-tube boilers and auxiliary installations - Part 10: Requirements for safety devices against excessive pressure

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Portable fire extinguishers - Part 8: Requirements for the construction, pressure resistance and mechanical tests for extinguishers with a maximum allowable pressure equal to or lower than 30 bar, which comply with the requirements of EN 3-7

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metal bellows expansion joints for pressure applications

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Metallic industrial piping - Part 5: Inspection and testing

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

LPG Equipment and accessories - Pressure relief valves for LPG pressure vessels

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 13: Operating instructions

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 18: Operating instructions

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 2: Materials for pressure parts of boilers and accessories

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 1: General

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 7: Requirements for equipment for the boiler

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 1: General

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Non-destructive testing - Qualification and certification of NDT personnel (ISO 9712:2021)

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 6: Submerged arc welded non-alloy steel tubes with specified low temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 5: Submerged arc welded non-alloy and alloy steel tubes with specified elevated temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 4: Electric welded non-alloy steel tubes with specified low temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 3: Electric welded and submerged arc welded alloy fine grain steel tubes with specified room, elevated and low temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 2: Electric welded non-alloy and alloy steel tubes with specified elevated temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 1: Electric welded and submerged arc welded non-alloy steel tubes with specified room temperature properties

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Safety devices for protection against excessive pressure - Part 1: Safety valves (ISO 4126-1:2013)

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Metallic industrial piping - Part 1: General

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Metallic industrial piping - Part 6: Additional requirements for buried piping

60.60 Standard published

L 121/6 Official journal reference
Apr 20, 2020 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Steel and cast iron check valves

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Metallic check valves

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Brazing - Procedure approval

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Requirements and testing for metallic valves as pressure accessories

90.00 Start of review/2 Year Review Enquiry

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

60.60 Standard published

L 361 Official journal reference
Oct 12, 2021 Official journal publication date

Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 2014/68/EU

60.60 Standard published

L 361 Official journal reference
Oct 12, 2021 Official journal publication date

Natural gas vehicles - Vehicle fuelling appliances

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Copper and copper alloys - Seamless, round tubes for air conditioning and refrigeration - Part 1: Tubes for piping systems

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 5: Inspection and testing

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Founding - Malleable cast irons

90.20 Standard under periodical review

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welding - Friction welding of metallic materials (ISO 15620:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Safety devices for protection against excessive pressure - Part 2: Bursting disc safety devices (ISO 4126-2:2018)

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Unfired pressure vessels - Part 2: Materials

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 4: Fabrication

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 1: General

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 6: Requirements for the design and fabrication of pressure vessels and pressure parts constructed from spheroidal graphite cast iron

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 5: Inspection and testing

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 2: Materials

99.60 Withdrawal effective

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges

90.60 Close of review

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Unfired pressure vessels - Part 1: General

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel castings for pressure purposes

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Aluminium and aluminium alloys - Wrought products and cast products - Special requirements for products intended for the production of pressure equipment

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Plastics piping systems for industrial applications - Polybutene (PB), polyethylene (PE), polyethylene of raised temperature resistance (PE-RT), crosslinked polyethylene (PE-X), polypropylene (PP) - Metric series for specifications for components and the system (ISO 15494:2015)

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 2: Materials

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Mobile fire extinguishers - Part 3: Requirements for the assembly, construction and pressure resistance of CO2 extinguishers which comply with the requirements of EN 1866-1

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Mobile fire extinguishers - Part 2: Requirements for the construction, pressure resistance and mechanical tests for extinguishers, with a maximum allowable pressure equal to or lower than 30 bar, which comply with the requirements of EN 1866-1

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 5: Martensitic, austenitic and austenitic-ferritic stainless steels

90.92 Standard to be revised

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Steel forgings for pressure purposes - Part 4: Weldable fine grain steels with high proof strength

99.60 Withdrawal effective

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Steel forgings for pressure purposes - Part 3: Nickel steels with specified low temperature properties

90.92 Standard to be revised

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperatures properties

99.60 Withdrawal effective

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Steel forgings for pressure purposes - Part 1: General requirements for open die forgings

90.92 Standard to be revised

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Cryogenic vessels - Toughness requirements for materials at cryogenic temperature - Part 2: Temperatures between -80 degrees C and -20 degrees C (ISO 21028-2:2018)

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Cryogenic vessels - Pressure-relief accessories for cryogenic service - Part 3: Sizing and capacity determination (ISO 21013-3:2016)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Toughness requirements for materials at cryogenic temperature - Part 1: Temperatures below -80 °C (ISO 21028-1:2016)

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Industrial valves - Metallic butterfly valves for general purposes

60.60 Standard published

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Unfired pressure vessels - Part 6: Requirements for the design and fabrication of pressure vessels and pressure parts constructed from spheroidal graphite cast iron

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Founding - Spheroidal graphite cast irons

90.93 Standard confirmed

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Metallic industrial piping - Part 4: Fabrication and installation

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Pressure equipment for refrigerating systems and heat pumps - Part 1: Vessels - General requirements

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Copper and copper alloys - Seamless, round tubes for air conditioning and refrigeration - Part 1: Tubes for piping systems

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Seamless, round copper tubes for medical gases or vacuum

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Seamless, round tubes for air conditioning and refrigeration - Part 2: Tubes for equipment

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 6: Additional requirements for buried piping

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 5: Inspection and testing

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 4: Fabrication and installation

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 3: Design and calculation

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 2: Materials

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 1: General

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Steel tubes for precision applications - Technical delivery conditions - Part 4: Seamless cold drawn tubes for hydraulic and pneumatic power systems

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel tubes for precision applications - Technical delivery conditions - Part 6: Welded cold drawn tubes for hydraulic and pneumatic power systems

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 5: Inspection and testing

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 7: Stainless steel tubes

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 5: Stainless steel tubes

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Qualification testing of welders - Fusion welding - Part 1: Steels (ISO 9606-1:2012 including Cor 1:2012 and Cor 2:2013)

60.60 Standard published

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Refrigerating systems and heat pumps - Liquid level indicating devices - Requirements, testing and marking

99.60 Withdrawal effective

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Industrial valves - Shell design strength - Part 4: Calculation method for valve shells manufactured in metallic materials other than steel

90.00 Start of review/2 Year Review Enquiry

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Refrigerating systems and heat pumps - Valves - Requirements, testing and marking (ISO 21922:2021)

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Unfired pressure vessels - Part 10: Additional requirements for pressure vessels of nickel and nickel alloys

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 6: Requirements for the design and fabrication of pressure vessels and pressure parts constructed from spheroidal graphite cast iron

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 5: Inspection and testing

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 4: Fabrication

99.60 Withdrawal effective

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 3: Design

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 2: Materials

99.60 Withdrawal effective

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Unfired pressure vessels - Part 1: General

60.60 Standard published

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Industrial valves - Globe valves of thermoplastics materials - Amendment 1 (ISO 21787:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Gate valves of thermoplastics materials - Amendment 1 (ISO 16139:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Diaphragm valves of thermoplastics materials - Amendment 1 (ISO 16138:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Check valves of thermoplastics materials - Amendment 1 (ISO 16137:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Butterfly valves of thermoplastics materials - Amendment 1 (ISO 16136:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Industrial valves - Ball valves of thermoplastics materials - Amendment 1 (ISO 16135:2006/Amd 1:2019)

60.60 Standard published

L 46/43 Official journal reference
Feb 10, 2021 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Unfired pressure vessels - Requirements for the design and fabrication of pressure vessels and pressure parts constructed from cast iron with an elongation after fracture equal or less than 15 %

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Plastics piping systems for industrial applications - Acrylonitrile-butadiene-styrene (ABS), unplasticized poly(vinyl chloride) (PVC-U) and chlorinated poly(vinyl chloride) (PVC-C) - Specifications for components and the system - Metric series - Amendment 1 (ISO 15493:2003/Amd 1:2016 + Cor 1:2004)

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Unfired pressure vessels - Part 2: Materials

99.60 Withdrawal effective

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Metallic industrial piping - Part 6: Additional requirements for buried piping

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Metallic industrial piping - Part 1: General

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Metallic industrial piping - Part 2: Materials

60.60 Standard published

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Flat products made of steels for pressure purposes - Part 1: General requirements

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Flat products made of steels for pressure purposes - Part 4: Nickel alloy steels with specified low temperature properties

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Flat products made of steels for pressure purposes - Part 3: Weldable fine grain steels, normalized

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Flat products made of steels for pressure purposes - Part 6: Weldable fine grain steels, quenched and tempered

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Flat products made of steels for pressure purposes - Part 5: Weldable fine grain steels, thermomechanically rolled

90.60 Close of review

C 49 Official journal reference
Feb 9, 2018 Official journal publication date

Refrigerating systems and heat pumps - Safety switching devices for limiting the pressure - Requirements and tests

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Refrigerating systems and heat pumps - Liquid level indicating devices - Requirements, testing and marking

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Refrigerating systems and heat pumps - Valves - Requirements, testing and marking

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joint - Circular flanges for pipes, valves, fittings and accessories, class designated - Part 4: Aluminium alloy flanges

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 4: Aluminium alloy flanges

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Portable fire extinguishers - Part 8: Additional requirements to EN 3-7 for the construction, resistance to pressure and mechanical tests for extinguishers with a maximum allowable pressure equal to or lower than 30 bar

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Gate valves of thermoplastics materials (ISO 16139:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Check valves of thermoplastics materials (ISO 16137:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Globe valves of thermoplastics materials (ISO 21787:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Butterfly valves of thermoplastics materials (ISO 16136:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Diaphragm valves of thermoplastics materials (ISO 16138:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Ball valves of thermoplastics materials (ISO 16135:2006)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for protection against excessive pressure - Part 3: Safety valves and bursting disc safety devices in combination (ISO 4126-3:2006)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Diaphragm valves made of metallic materials

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Valves - Shell design strength - Part 3: Experimental method

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static vacuum insulated vessels - Part 1: Fundamental requirements

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 1: Fundamental requirements

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic products - Types of inspection documents

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Materials - Part 1: Toughness requirements for temperatures below -80°C

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Qualification test of welders - Fusion welding - Part 2: Aluminium and aluminium alloys (ISO 9606-2:2004)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 6: Arc and gas welding of copper and its alloys (ISO 15614-6:2006)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 5: Arc welding of titanium, zirconium and their alloys (ISO 15614-5:2004)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 2: Arc welding of aluminium and its alloys (ISO 15614-2:2005)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys (ISO 15614-1:2004)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Qualification based on pre-production welding test (ISO 15613:2004)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welding - Friction welding of metallic materials (ISO 15620:2000)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Approval testing of welders - Fusion welding - Part 3: Copper and copper alloys (ISO 9606-3:1999)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 11: Electron and laser beam welding (ISO 15614-11:2002)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 7: Overlay welding (ISO 15614-7:2007)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 4: Finishing welding of aluminium castings (ISO 15614-4:2005)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Approval testing of welders - Fusion welding - Part 5: Titanium and titanium alloys, zirconium and zirconium alloys (ISO 9606-5:2000)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Approval testing of welders - Fusion welding - Part 4: Nickel and nickel alloys (ISO 9606-4:1999)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Filament-wound FRP pressure vessels - Materials, design, manufacturing and testing

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Plate, sheet and circles for boilers, pressure vessels and hot water storage units

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

GRP tanks and vessels for use above ground - Part 2: Composite materials - Chemical resistance

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

GRP tanks and vessels for use above ground - Part 1: Raw materials - Specification conditions and acceptance conditions

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Plate, sheet and circles for boilers, pressure vessels and hot water storage units

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 8: Welding of tubes to tube-plate joints (ISO 15614-8:2016)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 5: Inspection and testing

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 4: Fabrication and installation

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 6: Weldable fine grain steels, quenched and tempered

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 5: Weldable fine grain steels, thermomechanically rolled

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 4: Nickel alloy steels with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 3: Weldable fine grain steels, normalized

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Seamless, round copper tubes for water and gas in sanitary and heating applications

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 1: General requirements

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Shell design strength - Part 4: Calculation method for valve shells manufactured in metallic materials other than steel

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Plastics piping systems for industrial applications - Acrylonitrile-butadiene-styrene (ABS), unplasticized poly(vinyl chloride) (PVC-U) and chlorinated poly(vinyl chloride) (PVC-C) - Specifications for components and the system - Metric series (ISO 15493:2003)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metallic industrial piping - Part 2: Materials

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cookware - Pressure cookers for domestic use

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Founding - Ausferritic spheroidal graphite cast irons

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Founding - Spheroidal graphite cast irons

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Refrigerating systems and heat pumps - Pressure relief devices and their associated piping - Methods for calculation

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Cast iron globe valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Copper alloy gate valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Steel globe and globe stop and check valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Steel gate valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 2: Arc welding of aluminium and its alloys (ISO 15614-2:2005/Cor 2:2009)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 3: Copper alloy flanges

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Non-destructive testing - Qualification and certification of NDT personnel (ISO 9712:2012)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Metallic butterfly valves

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Valves - Shell design strength - Part 3: Experimental method

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Closed expansion vessels with built in diaphragm for installation in water

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Rolled, finned, seamless tubes for heat exchangers

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Seamless, round tubes for heat exchangers

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steels and nickel alloys for fasteners with specified elevated and/or low temperature properties

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for gas pressure regulating stations and installations - Gas safety shut-off devices for inlet pressures up to 100 bar

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Pressure equipment - Part 7: Safety systems for unfired pressure equipment

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Safety devices for protection against excessive pressure - Part 1: Safety valves for cryogenic service

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys - Amendment 2 (ISO 15614-1:2004/Amd 2:2012)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for protection against excessive pressure - Part 4: Pilot-operated safety valves (ISO 4126-4:2013)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cookware - Pressure cookers for domestic use

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 5: Stainless steel tubes

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 4: Non-alloy and alloy steel tubes with specified low temperature properties

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 3: Alloy fine grain steel tubes

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 1: Non-alloy steel tubes with specified room temperature properties

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Butt-welding pipe fittings - Part 4: Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Plastics piping systems for industrial applications - Poly(vinylidene fluoride) (PVDF) - Specifications for components and the system (ISO 10931:2005)

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Refrigerating systems and heat pumps - Safety and environmental requirements - Part 2: Design, construction, testing, marking and documentation

90.92 Standard to be revised

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Shell boilers - Part 3: Design and calculation for pressure parts

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell Boilers - Part 6: Requirements for equipment for the boiler

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Unfired pressure vessels - Part 3: Design

99.60 Withdrawal effective

L 250/95 Official journal reference
Sep 30, 2019 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys - Amendment 1 (ISO 15614-1:2004/Amd 1:2008)

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 7: Stainless steels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Copper and copper alloys - Forgings

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Design rules for gasketed circular flange connections - Part 1: Calculation

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 3: Copper alloy flanges

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Copper alloy ball valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Plastics piping systems for industrial applications - Poly(vinylidene fluoride) (PVDF) - Specifications for components and the system (ISO 10931:2005/FDAM 1:2015)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

GRP tanks and vessels for use above ground - Part 3: Design and workmanship

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Metal bellows expansion joints for pressure applications

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Portable fire extinguishers - Part 8: Additional requirements to EN 3-7 for the construction, resistance to pressure and mechanical tests for extinguishers with a maximum allowable pressure equal to or lower than 30 bar

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Stainless steel bars for pressure purposes

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Hot rolled weldable steel bars for pressure purposes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static vacuum insulated vessels - Part 2: Operational requirements (ISO 21009-2:2015)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 4: Finishing welding of aluminium castings (ISO 15614-4:2005/Cor 1:2007)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 2: Design, fabrication, inspection and testing

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static vacuum insulated vessels - Part 2: Design, fabrication, inspection and testing

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 1: General requirements

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Marking of metallic valves

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Cast iron gate valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Steel ball valves

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Refrigerating systems and heat pumps - Safety and environmental requirements - Part 2: Design, construction, testing, marking and documentation

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Automatic forced draught burners for liquid fuels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

LPG Equipment and accessories - Specification and testing for Liquefied Petroleum Gas (LPG) pressure vessel valves and fittings

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

LPG equipment and accessories - Equipping of overground and underground LPG vessels

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flat products made of steels for pressure purposes - Part 7: Stainless steels

90.93 Standard confirmed

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Hot rolled weldable steel bars for pressure purposes with specified elevated temperature properties

90.93 Standard confirmed

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Stainless steel bars for pressure purposes

90.93 Standard confirmed

C 389 Official journal reference
Nov 17, 2017 Official journal publication date

Pressure equipment - Part 7: Safety systems for unfired pressure equipment

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Butt-welding pipe fittings - Part 4: Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 3: Alloy fine grain steel tubes

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 6: Submerged arc welded non-alloy steel tubes with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 5: Submerged arc welded non-alloy and alloy steel tubes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 4: Electric welded non-alloy steel tubes with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Stainless steel shell boilers

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 10: Requirements for safeguards against excessive pressure

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 8: Requirements for safeguards against excessive pressure

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 7 : Requirements for firing systems for liquid and gaseous fuels for the boilers

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 4: Workmanship and construction of pressure parts of the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Materials - Part 1: Toughness requirements for temperatures below -80°C

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Gas/material compatibility

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Safety devices for protection against excessive pressure - Part 2: Bursting disc safety devices for cryogenic service

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Couplings for cryogenic service

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Materials - Part 2: Toughness requirements for temperatures between -80°C and -20°C

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 2: Electric welded non-alloy and alloy steel tubes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 1: Non-alloy steel tubes with specified room temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 5: Martensitic, austenitic and austenitic-ferritic stainless steels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 4: Weldable fine grain steels with high proof strength

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 5: Martensitic, austenitic and austenitic-ferritic stainless steels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 4: Weldable fine grain steels with high proof strength

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 3: Nickel steels with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 1: General requirements for open die forgings

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 3: Copper alloy flanges

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 3: Copper alloy flanges

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static vacuum insulated vessels - Part 2: Design, fabrication, inspection and testing

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 2: Design, fabrication, inspection and testing

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 3: Operational requirements

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Cryogenic flexible hoses

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Cryogenic flexible hoses

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 1 : General requirements for open die forgings

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cookware - Pressure cookers for domestic use

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 8: Requirements for safeguards against excessive pressure

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 3: Operational requirements

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Founding - Malleable cast irons

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for gas pressure regulating stations and installations - Gas safety shut-off devices for inlet pressures up to 100 bar

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Water-tube boilers and auxiliary installations - Part 11: Requirements for limiting devices of the boiler and accessories

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 9: Requirements for limiting devices of the boiler and accessories

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 6: Submerged arc welded non-alloy steel tubes with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 5: Submerged arc welded non-alloy and alloy steel tubes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 4: Electric welded non-alloy steel tubes with specified low temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 2: Electric welded non-alloy and alloy steel tubes with specified elevated temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 3: Alloy fine grain steel tubes

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 1: Non-alloy steel tubes with specified room temperature properties

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for protection against excessive pressure - Part 1: Safety valves (ISO 4126-1:2013)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Heating boilers - Heating boilers with forced draught burners - Nominal heat output not exceeding 10 MW and maximum operating temperature of 110 °C

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Shell boilers - Part 4: Workmanship and construction of pressure parts of the boiler

90.60 Close of review

C 326/03 Official journal reference
Sep 14, 2018 Official journal publication date

Safety devices for protection against excessive pressure - Part 5: Controlled safety pressure relief systems (CSPRS) (ISO 4126-5:2013)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non vacuum insulated vessels - Part 3: Operational requirements

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Static non-vacuum insulated vessels - Part 2: Design, fabrication, inspection and testing

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Brazing - Qualification test of brazers and brazing operators (ISO 13585:2012)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Shell design strength - Part 1: Tabulation method for steel valve shells

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Industrial valves - Testing of metallic valves - Part 1: Pressure tests, test procedures and acceptance criteria - Mandatory requirements

90.60 Close of review

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Founding - Austenitic cast irons

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Cryogenic vessels - Valves for cryogenic service

90.93 Standard confirmed

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Gas pressure regulators for inlet pressures up to 100 bar

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Automatic forced draught burners for gaseous fuels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Automatic forced draught burners for gaseous fuels

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date

Corrugated metal hose assemblies for pressure applications - Part 1: Requirements

90.92 Standard to be revised

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Pressure equipment for refrigerating systems and heat pumps - Part 1: Vessels - General requirements

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Gas-loaded accumulators for fluid power applications

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Safety devices for protection against excessive pressure - Part 7: Common data (ISO 4126-7:2013)

60.60 Standard published

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Welded steel tubes for pressure purposes - Technical delivery conditions - Part 7: Stainless steel tubes

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

LPG equipment and accessories - Static welded steel cylindrical tanks, serially produced for the storage of Liquefied Petroleum Gas (LPG) having a volume not greater than 13 m³ - Design and manufacture

99.60 Withdrawal effective

C 293/01 Official journal reference
Aug 12, 2016 Official journal publication date

Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperatures properties

90.92 Standard to be revised

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Steel forgings for pressure purposes - Part 4: Weldable fine grain steels with high proof strength

90.92 Standard to be revised

L 457 Official journal reference
Dec 21, 2021 Official journal publication date

Stainless steel steam boilers

60.60 Standard published

L 361 Official journal reference
Oct 12, 2021 Official journal publication date

Industrial valves - Shell design strength - Part 2: Calculation method for steel valve shells

60.60 Standard published

L 254 Official journal reference
Oct 3, 2022 Official journal publication date